Refit take two. Villamoura

Two days into Vilamoura and the boat was out of the water. Clean the bottom, inspect the rudder and back in the water with a new teflon sheeth to firm up the rudder pintel connection. The above is a picture of able seaman Ricky hard at work. Nothing like lifting 7 tons of boat out of the water to get everyone going.